top of page

Tarbaby

1965 Hatteras 34

Spring 2019 Project List

  • Rebuild and maintenance of engines

  • Clean and paint engine room and bilges

  • Replace steering system piping

  • Install reactor auto pilot, including fabrication of a new shelf

  • Replace overhead in main salon

  • Troubleshoot/replace raw water wash down pump

  • Troubleshoot/replace midship bilge pump

  • Underwater lights

  • Install cockpit courtesy lighting

  • Fabricate new exterior engine room ventaliation

  • Troubleshoot Electrical and Install SmartPlug Shore Power

  • Replace/fix various areas of teak

  • Replace transom

  • refinish bright work

  • Address various fiberglass repairs

Transom, cabin, and teak work

Rebuild and Maintenance of Engines, Painting Engine room and bilge

Custom Fabrication of new Engine Vents

Troubleshoot Underwater Lights

Troubleshoot Electrical and Install SmartPlug Shore Power

Install Prop tight Locking Nuts

Spring 2020 Project List

Install New Lithionics Batteries

  • Install new Lithionics batteries

bottom of page